“Integrated Scheduling and Resource Planning for Airport Terminal Construction: A Case Study” (2018) International Journal of Research Publications in Engineering, Technology and Management (IJRPETM), 1(2), pp. 312–315. doi:10.15662/IJRPETM.2018.0102002.