Integrated Scheduling and Resource Planning for Airport Terminal Construction: A Case Study. (2018). International Journal of Research Publications in Engineering, Technology and Management (IJRPETM), 1(2), 312-315. https://doi.org/10.15662/IJRPETM.2018.0102002