[1]
2018. Integrated Scheduling and Resource Planning for Airport Terminal Construction: A Case Study. International Journal of Research Publications in Engineering, Technology and Management (IJRPETM). 1, 2 (Sep. 2018), 312–315. DOI:https://doi.org/10.15662/IJRPETM.2018.0102002.